Rebuilding of Fazel Baig School in Kabul

Project Name: Rebuilding Fazel Baig School     
Project Type: 
Project Location: Fazel Baig, Kabul
Duration of Project:
Donor of Project: Ajuntament de Barcelona, Ajuntament de Lleida, Principat d’Asturies, Diputacio d’Albacete through ASDHA
Status of Project: Ended and closed

The aim of this project was to support public school structures in the capital city, but in remote areas of the location.

Fazil Baig primary school which is having a number of 2500 students (girls and boys) is a primary school (1st to 6th grade). HAWCA provided the school with the establishment of proper drinking water system, chairs, stationary, school bags, some reparation works as well as premium for teachers in monthly bases. Besides, HAWCA Project Office was monitoring their studying system and following the attendant books of teachers and students regularly, in order to improve their regular access to education in the school.